Welcome!
Think of this site as a diary of DIY home construction.
Update January 2009:
Hi friends, I had made my blog private for some time but have decided to open it back up again. I was way too busy with other things. I am happy to report we have moved in but still have much to do to complete things. There is still trim to put up, some grouting to do, a few more floors to finish but more on this later. I am in the process of redoing this blog and just wanted to thank everyone for visiting :)
September 19, 2007
Ceramic tile for the living room
Well, we had some problems with our brown bag floors in the living room. Seems that after I had finished them, they got wrinkles in them. This happened with our son's room as well. The only thing we can figure is that it had something to do with temperature/humidity. We decided to take all of it up with scrapers and lay ceramic tile in its place. This has been hard work but it had to be done. We were going to sand down the bag flooring and add the tile over it but were afraid we might run into a problem down the road if we didn't get the bag flooring up and start with clean concrete. The poly and paper was not easy to get up but a scraper I found at Lowe's with a extending handle and 4 inch straight blade helped tremendously. We were able to get underneath all that poly and paper and get most of it up. Today I'm going to spend the day in knee pads scrubbing up all the remaining paper. I will take a picture of this process and also of our new ceramic tile.
Labels: ceramic tile, flooring, living room
New Appliances!
Labels: appliances, kitchen
September 17, 2007
Just when I think we are getting closer to moving in..
Seems like there is always another thing to do to finish this house and get moved in. Just when it seems we are almost finished, we think of something else that must be done.
In our master bath, my husband needs to build a wood extender that will go across at a diagonal from our tub to the corner of the toilet. After he gets this done I can sand the wood, stain it, and then cover it with poly. Once that is done, I can start working on tiling the floor of that room and maybe the washroom. We bought ceramic tile a few days ago and we will install it ourselves. We put the light fixture in the master bath a few days ago.
September 14, 2007
What remains of the painting
Kitchen ceiling (may need to buy more paint for this job).
Master bath ceiling
About half of the master bedroom ceiling and the half bath.
Am planning on doing the kitchen ceiling last. The flooring in both baths will be white ceramic tile but not sure about which grout color to go with. If anyone has any suggestions, I am open to them :)
Lately my mind is drifting from these things (painting and flooring), and I find myself dreaming of such things as kitchen backsplashes and window blinds.
Labels: painting
All indoor plumbing finished.....finally!
The husband finished all of the indoor plumbing work a few days ago. He had me buy a 10 foot stick of 4 inch sewer pipe yesterday and last night he laid that in the ground. We will be needing around 40 more feet of this pipe to finish the job. Lately we have been so worn out and stressed from from this build, but we know that someday soon it will be over and we'll get to move in. That keeps us going.
Labels: plumbing